[TMLD] Time Loads for Construction Stage
Introduce Input Data Symbols
API - Value Type | Input Data | ||
---|---|---|---|
Integer | 🔴 | Essential | |
String | ❌ | Unnecessary | |
Boolean | 🔺 | Optional | |
Real |
|
|
The required Input Data for defining Time Loads for Construction Stage
NO. | Name | API - Key | API - Value Type | Defalut | Time Loads |
---|---|---|---|---|---|
1 | Element No. | “KEY” |
| 🔴 | |
2 |
| "ITEMS" |
|
| 🔴 |
3 | Serial Number
| "ID" | 0 | 🔺 | |
4 | Load Group Name | "GROUP_NAME" |
| 🔺 | |
5 | Time Loads | "DAY" |
| 🔴 |
The JSON format example for inputting Time Loads for Construction Stage